Fire and electrical safety change as a site grows
A construction site starts with a site shed and a temporary switchboard. Six months later it might have a dozen trades, hot work on every floor, gas bottles, fuel and a stack of packaging. The fire and electrical risks grow with it.
We look after the parts that need regular checks: the tools and leads plugged into site power, the fire extinguishers, and the emergency plan that tells everyone on site what to do.
Test and tag every 3 months
SafeWork SA sets a 3-monthly test and tag interval for electrical equipment used in construction, because tools and leads on a site take a beating. The WHS regulations that apply are 150 and 163 to 165. AS/NZS 3760:2022 is the guidance most testers follow.
| Workplace | SafeWork SA interval |
|---|---|
| Construction | Every 3 months |
| Hire equipment | At each hire, and every 3 months |
| Manufacturing and commercial cleaning | Every 6 months |
| Other hostile environments | At least every 12 months |
On a site visit we:
- inspect and test every portable tool, extension lead, power board and portable RCD brought to us
- tag each item with the test date and next test date
- tag out anything that fails, so it cannot be used, and list it in the report
- test 3-phase equipment and safety switches (RCDs)
- send the register for your site records, by item, by trade or by subcontractor
We can run a gate check at the start of a job, so equipment that arrives with a new trade is tested before it is used. See test and tag.
We are qualified and licensed for electrical test and tag.
Fire extinguishers on site
A site’s fire hazards change from stage to stage. Hot work, fuel for plant, LPG for heaters, switchboards and stacked timber or packaging each call for the right type of extinguisher in the right place.
We supply and mount extinguishers to suit the stage of the build, and service them every 6 months to AS 1851-2012, the same schedule used in finished buildings. When the site moves into a new stage, we review the locations with your site manager. When the building is handed over, the permanent extinguishers go onto the owner’s schedule.
Emergency plans for construction sites
Every workplace needs an emergency plan under WHS regulation 43, and a construction site is a workplace. A site plan needs to cover how the alarm is raised, how people leave, where they assemble, who calls emergency services and how the fire brigade gets onto the site. As the building rises and the exits change, the plan has to change with it.
We can help you draft the plan and a site evacuation diagram, and update both as the site changes. AS 3745 is best practice for emergency planning, but we have found no SA law that mandates it. See emergency management plans and evacuation diagrams.
One schedule for the whole build
Builders with several sites can put each one on a single schedule: 3-monthly test and tag, 6-monthly extinguisher service and a plan review at each new stage. You get one report per site, ready for your safety file and for any SafeWork SA inspector who asks.
The rules that apply
| Requirement | What it means | Standard | SA source |
|---|---|---|---|
| Electrical equipment used in construction | Every 3 months | WHS Regulations 150 and 163 to 165, with AS/NZS 3760:2022 as guidance | SafeWork SA |
| Hire equipment | At each hire and every 3 months | WHS Regulations (SA) | SafeWork SA |
| Workplace emergency plan | Prepared, maintained and implemented for every workplace | WHS Regulations (SA), regulation 43 | SafeWork SA |
| Portable fire extinguishers | Every 6 months, plus yearly and 5-yearly | AS 1851-2012 | MBS 002 v3 (SA) |