Test and tag colours show the 3-month period an item was tested in: red for December to February, green for March to May, blue for June to August and yellow for September to November. On a site where equipment is retested every quarter, an out-of-date colour stands out straight away.
What test and tag colours mean
Every item of plug-in electrical equipment that’s been tested gets a tag recording the test. Under the colour system, the tag’s colour identifies the 3-month period in which the test was done. It doesn’t show whether the item passed (only items that pass are tagged as tested) or when it’s next due. It just makes a quarterly testing cycle easy to check from across the room.
That’s why it’s mostly used on construction and demolition sites. SafeWork SA says plug-in equipment used there should generally be inspected and tested at least once every 3 months (SafeWork SA). With one colour per quarter, a site supervisor can spot an overdue lead at the gate without reading a single date.
The test and tag colour chart
The rotation below is the one given as the recommended colour coding in SafeWork SA’s Building and Construction Industry Guideline: Electrical.
| Tag colour | Period the test was done |
|---|---|
| Red | 1 December to end of February |
| Green | 1 March to 31 May |
| Blue | 1 June to 31 August |
| Yellow | 1 September to 30 November |
The same four colours repeat in the same order every year. SafeWork SA’s guideline gives this as its recommended coding and notes that some builders have their own requirements, so check the site rules when you start on a new job.
What colour is the test tag right now?
For the months around this guide’s update date:
- September to November 2026: yellow.
- December 2026 to February 2027: red.
- March to May 2027: green.
- June to August 2027: blue.
On a site testing every 3 months, any item carrying a colour from two quarters ago, or with no tag at all, should come out of use until it’s retested.
Are test and tag colours a legal requirement in SA?
We haven’t found a South Australian law that requires colour-coded tags. Here’s how the pieces fit:
- The law requires the testing. Under the Work Health and Safety Regulations 2012 (SA), plug-in equipment in hostile operating environments must be regularly inspected and tested by a competent person, and construction work must follow AS/NZS 3012. SafeWork SA’s guidance turns that into intervals: at least every 3 months on construction sites, every 6 months in manufacturing and commercial cleaning, at least every 12 months in other hostile environments, and for hire equipment an inspection before each hire and testing every 3 months.
- The guidance recommends the colours. SafeWork SA’s construction guideline gives the colour rotation as recommended colour coding. SafeWork NSW’s construction fact sheet likewise describes colour-coded tags as optional.
- The tag content is what matters. SafeWork SA’s guideline says the tag should show the name of the person or company who did the test and the test or retest date. WHS regulation 150 also requires the record to show the result and when the next test is due, which can be on the tag or in a register. That record, in any colour, does the legal job.
A head contractor can still make the colour rotation a condition of working on its site, so if you’re working on someone else’s site, check their rules. That’s an industry and site requirement, not an SA law.
Do you need colour tags outside construction?
Usually not. In factories and workshops, SafeWork SA’s guidance is testing at least every 6 months. In low-risk areas such as offices, its table lists intervals of up to 5 years. A quarterly colour wouldn’t tell you much on those schedules, so most businesses use a standard tag showing the test date and the next due date, and keep a register. See our guide to how often you need to test and tag for the full list of intervals.
Hire companies are the main exception. Hire equipment is inspected at the start of each hire and tested every 3 months, so hire businesses may use the colour rotation too.
Tags for RCDs and failed equipment
Portable RCDs used on construction sites are also on a 3-month cycle: SafeWork SA’s guideline calls for a performance (trip-time) test at least every 3 months, with a push-button test before use each day. Portable RCDs can be tagged in the same colour as the leads tested on the same visit. See our RCD testing guide.
Equipment that fails isn’t given a coloured test tag. It’s taken out of service and labelled so nobody uses it until it’s repaired, replaced or disposed of.
Keeping it simple on your site
The colour system only works if every item on site is tested on the same quarterly cycle. The easiest way is to book your testing for the start of each colour period: early December, March, June and September. VD Fire & Electrical tests and tags construction site equipment across Adelaide on a quarterly schedule. Call 08 8151 1040 or see our test and tag service.